Home   |   Contact Us   |   Sitemap
 
 
Tablets
Capsules
Soft Gelatin Capsules
Dry Syrup
Ointment, Cream and Lotion
Liquid
Injectables
Packing
Utility
HVAC
Aids & Accessories
Modular Clean Room
 
Turnkey Services
Detailed Engineering Services
  1. Civil
  2. Electrical
  3. Lighting
  4. Air Conditioning and Ventilation
  5. Utilities
  6. Drainage
  7. Aids and Accessories
  8. Process
  9. Equipment
  10. Drawings
  11. Equipment

1. Civil :

  • Prepare Area Statements
  • Design an optimal layout within the area available confirming to CGMP requirements.
  • Lay down flooring specifications with slopes
  • Specify suitable wall thickness and prepare elevations showing glazings, doors, risers, pipelines and power points.
  • Specify suitable sections for glazings and give detailed designs for the same.
  • Specify door designs at various locations.
  • Specify the height of slabs.
  • Specify cutouts in slabs for * Utilities * Lighting * Filters * Drainage * Air-ducts
  • Give coving details for sterile area.
  • Give tentative Bar charts for civil works.
  • Check and approve sample floorings.
  • Guide the civil contractor at various stages, for CGMP aspects of construction.
    Top    
     
    2. Electrical:
  • Prepare a list of connected load.
  • Design electrical distribution systems.
  • Lay down flooring specifications with slopes
  • Design specifications for main control panel and distribution panels.
  • Design electrical line diagrams showing cable lengths and sizes.
  • Design power socket schedule and location points.
  • Design earthing circuit diagrams.
  • Prepare bill of material.
  • Guide electrical contractors at various stages.
    Top    
    3. Lighting :
  • Design illumination levels in various rooms and suggest suitable fittings.
  • Design specification for distribution boards.
  • Design emergency light systems.
  • Design wiring routes and suggest circuit controls.
  • Prepare list of connected load.
  • Design insectocutor systems.
  • Guide the contractors during various stages.
    Top    
    4. Air Conditioning and Ventilation:
  • Specify environmental conditions for different areas.
  • Specify A.C. tonnage/capacities/static heads for various AHU/FCU to achieve desired environmental conditions.
  • Design necessary ductings, duct ratings, AHU/FCU locations.
  • Detail the ducts showing dampers, fire dampers, rexin connectors and manometer locations.
  • Prepare insulation specifications.
  • Prepare chilled water piping and condensed water piping details.
  • Suggest suitable air curtain locations and capacities.
  • Prepare schedules in co-ordination with your contractor with respect to associated activities.
  • Prepare bill of materials for major items.
  • Guide the contractor during various stages of installation.
  • Assist in carrying out validation as per specifications.
  • Invite quotations from suppliers for filtration systems.
  • Carry out a comparative analysis of the quotations in terms of conformity to specifications and other commercial aspects.
  • Submit recommendations for selection of suppliers on the basis of above analysis.
  • Assist clients, if required, in finalising orders.
  • Follow up with suppliers for timely delivery.
  • To assist in necessary validation of filters by DOP / Particulate count / Fungal count / Bacterial count test.
    Top    
    5. Utilities:
  • Design requirements for the following requisite utilities:· Raw water · D.M. Water · Distilled water· Steam · Compressed air· Nitrogen· Vacuum · Oxygen · LPG· Steam condensate return
  • Design and specify suitable routes with drawings and mounting details for the piping system for above utilities.
  • Specify MOC for various piping.
  • Specify suitable fittings.
  • Specify locations of utility equipment's.
  • Prepare elevations of various pipelines.
  • Submit bill of materials for all major items
  • Guide the contractors during various stages of implementation.
  • Prepare bar-charts.
    Top    
    6. Drainage:
  • Prepare drainage requirements for various areas.
  • Prepare schedule of drain pipes for various locations.
  • Specify MOC for drain pipes.
  • Prepare schedule for inspection chambers in the line.
    Top    
    7. Aids and Accessories :
  • Specify list of aids and accessories like chairs / tables / material handling equipments, ladders, scoops, telephone locations and fire extinguisher types and locations.
    Top    
    8. Process:
  • Calculate optimal batch size on product mix basis.
  • Prepare suitable flow charts confirming to process requirements.
    Top    
    9. Equipment:
  • Suggest suitable machines and toolings for the given product mix and fill sizes confirming to desired specifications.
  • Prepare detailed specifications of various machines and tooling.
  • Prepare detailed specifications for packaging inputs like Vials/Ampoules/Stoppers and Seals.
    Top    
    10. Drawings:
    The following drawings will be submitted :
  • Building
       Site layout details.
       Area layout.
       Wall Elevation.
     •  Flooring details.
       Door schedules.
       Machine layouts.
       Glazing details.
     •  Typical Glazing Sections.
       Drainage details.

  • Air Conditioning/Ventilation
     •  Sectional detail of A/C systems.
     •  Sectional detail of Ventilation systems.
       Ducting layout.
       Grill layout.
  • Power
       Single line layout.
       Lighting and Grill layout.
       Lighting layout of service slab.
     •  Control point layout.
       Distribution boards layout.
       Power socket layout.
       Cable route.
     •  Specification sheets.
       Insectocutor locations.
       Air Curtain locations
       Emergency light locations

  • Utility/Process Pipelines :( Raw Water, D.M. Water, Chilled Water, Steam,Compressed Air, Nitrogen, Oxygen, LPG and Vacuum ).*
       Schematic diagrams.
       Point locations.
       Flow diagrams.
     •  Combined Pipeline Layout Isometric.
       Physical diagram of pipelines.
       Multi Cylinder Gas Manifold System.
    Top    
    Machinery Procurement And Inspection Services
    11. Equipment :
  • Prepare a time schedule for completion of Project in terms of bar-charts for supply of machines.
  • Co-ordinate with manufacturers for
       Timely deliveries
       Followup, as and when necessary
       Stagewise inspection for critical equipments
     •  Final inspection and trials at suppliers premises alongwith your
       Representative if desired

  • Prepare inspection reports.
  • Co-ordinate with suppliers for installation and commissioning of the machine and ensure line integration.
  • Arrange for proper documentation from respective suppliers of critical equipment.
  • Lay down validation criteria for all major/critical machines.
  • Assist you/supplier in carrying out validation.
    Top